about 62 in concord, 61 in antioch, inside the bay temperatures in the 50s and 60s. let's check the roads with elizabeth. >> thank you, lawrence. and metering lights on still at the bay bridge toll plaza. so traffic is stacking up towards the overcrossing. probably about 10 or 15 minutes right now to get you on the span. elsewhere, to our maps and eastbound highway 4 at loveridge we're watching a big rig versus car accident again going against the commute but the really slow traffic is in the commute direction westbound heading through antioch. elsewhere, down towards the south bay, where of course they are activating the new metering lights beginning today. so just a heads up if you're traveling northbound 280 through downtown san jose. activated since 6:00 this morning continues until 10 a.m. so it's actually that connector ramp from the guadalupe parkway to 280 that could really get stacked up as the commute gets under way. we heard from a member of the kcbs phone force. it's slow-and-go on 17 through the santa cruz mountains. the accident approaching idylwild roa